Advance to content | List of Access Keys |

Table 13. Summary of treatment options for risk reduction by hazard type

Return to the point in the document where the table is located

Treatment Option Zoning Policies Rules Requiring specific approval to develop Building standards and controls Acquiring / purchasing land Asset and infrastructure management Non-structural hazard modification Structural hazard modification Relocate existing developments Charges / financial contributions Lifelines engineering Specific hazard strategies Integrated hazard strategies
Section of Report 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.3.8 7.3.9 7.3.10 7.3.11 7.3.12 7.3.13 7.3.14 7.3.15
Flooding Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Volcanic Yes Yes Yes Yes Yes Yes Yes     Yes   Yes Yes Yes
Seismic Yes Yes Yes Yes Yes Yes Yes     Yes   Yes Yes Yes
Tsunami Yes Yes Yes Yes   Yes Yes     Yes   Yes Yes Yes
Coastal Yes Yes Yes Yes   Yes Yes Yes Yes Yes Yes Yes Yes Yes
Landslide Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Meteorological   Yes Yes Yes Yes   Yes         Yes Yes Yes

 

Return to the point in the document where the table is located